EARNED VALUE PROJECT

Earned Value Project Calculator

Calculate project cost/schedule indices and a cost-performance-based completion estimate from entered PV, EV, AC and BAC.

Enter your values

01 / INPUT
Calculated on your device

YOUR CALCULATION

Result

—

Calculation steps

Work through one step at a time or reveal the complete calculation. The steps use your current inputs.

    How to calculate

    Keep planned, earned and actual values in the same monetary baseline and explicitly use the constant-CPI completion scenario.

    CPI=EV/AC; SPI=EV/PV; EAC=BAC/CPI; cost variance=EV−AC; schedule variance=EV−PV

    Worked example

    PV=10000, EV=8000, AC=9000 and BAC=50000 give CPI 8/9, SPI 0.8 and modeled EAC 56250 in the chosen currency.

    Assumptions and input details

    PV and EV cannot exceed BAC. EAC assumes the current cumulative cost efficiency continues; no actual remaining-work forecast is inferred. Schedule variance is in budget value, not elapsed days. TCPI to BAC is undefined when actual cost has exhausted BAC.

    Using this calculator

    Can I enter my own problem?

    Yes. Replace the example values with your own inputs. The result, calculation steps, tables and applicable diagrams update from those inputs. Blank or invalid values clear the result; example values are never silently substituted for missing inputs.

    Are the results exact?

    Results use floating-point arithmetic and displayed rounding. Read the formula, assumptions and any stated data precision before interpreting the result.

    Is my input uploaded?

    The calculation runs in your browser. No account, file upload or external AI service is required. Inputs are not saved between page reloads.

    RELATED TOOL · PLANNINGCritical Path and Project Slack Calculator

    Calculate earliest and latest task times, total slack and critical tasks in a dependency network.

    RELATED TOOL · INDEPENDENT SERIAL PATH APPROXIMATIONPERT Path Duration and Deadline Calculator

    Combine three-point task estimates into a fixed serial path’s expected duration, variance and normal-approximation deadline probability.

    RELATED TOOL · STATISTICSForecast Error MAE and RMSE Calculator

    Evaluate paired actual and forecast values with signed bias, absolute errors and explicitly defined percentage metrics.

    ADVERTISEMENT

    Reserved advertising space.